City | Delivery/Assembly time from Order Date |
---|---|
Mumbai | 5-7 Days |
Pune | 5-7 Days |
Bengaluru | 9-11 Days |
Hyderabad | 9-11 Days |
Chennai | 9-11 Days |
Cochin | 10-12 Days |
Coimbatore | 10-12 Days |
NCR | 11-13 Days |
Chandigarh/Derabassi | 11-13 Days |
Surat | 5-7 Days |
Vadodara | 6-8 Days |
Ahmedabad | 6-8 Days |
City |
Delivery/Assessment Time From Order Date |
---|---|
Mumbai | 5-7 Days |
Pune | 5-7 Days |
Surat | 5-7 Days |
Vadodara | 6-8 Days |
Ahmedabad | 6-8 Days |
Bengaluru | 9-11 Days |
Hyderabad | 9-11 Days |
Chennai | 9-11 Days |
Cochin | 9-12 Days |
Coimbatore | 9-12 Days |
NCR | 11-13 Days |
Chandigarh/Derabassi | 11-13 Days |
Kolkatta | 15-18 Days |
Width | 1795 |
Depth | 795 |
Height | 755 |
Width | 440 |
Depth | 495 |
Height | 880 |
Chair Legs-Solid Rubber Wood | |
Chair back-MDF | |
Chair seat Construction-Box seat Construction | |
Chair Upholstery-Fabric | |
Dining Table Top-10 mm Tempered Glass top | |
Table Legs-MDF with Veneer |
Solid Rubber Wood Legs Gives it Sturdiness to the Chair | |
Box Seat Construction hold the legs firmly | |
Table legs are made up of MDF with Veneer which gives sturdy look to the Dining table |