City | Delivery/Assembly time from Order Date |
---|---|
Mumbai | 5-7 Days |
Pune | 5-7 Days |
Bengaluru | 9-11 Days |
Hyderabad | 9-11 Days |
Chennai | 9-11 Days |
Cochin | 10-12 Days |
Coimbatore | 10-12 Days |
NCR | 11-13 Days |
Chandigarh/Derabassi | 11-13 Days |
Surat | 5-7 Days |
Vadodara | 6-8 Days |
Ahmedabad | 6-8 Days |
City |
Delivery/Assessment Time From Order Date |
---|---|
Mumbai | 5-7 Days |
Pune | 5-7 Days |
Surat | 5-7 Days |
Vadodara | 6-8 Days |
Ahmedabad | 6-8 Days |
Bengaluru | 9-11 Days |
Hyderabad | 9-11 Days |
Chennai | 9-11 Days |
Cochin | 9-12 Days |
Coimbatore | 9-12 Days |
NCR | 11-13 Days |
Chandigarh/Derabassi | 11-13 Days |
Kolkatta | 15-18 Days |
Width | 900 |
Depth | 550 |
Height | 955 |
Table top made of 18 mm thick MDF with PVC lamination | |
All other wooden parts in 15 mm thick MDF with PVC lamination | |
Understructure made of 0.8 mm thick powder-coated steel |
Keyboard tray & Shelves for CPU, UPS, books | |
Shelf on top for printer | |
Spacious table top to accommodate Monitor, speakers, scanner etc. | |
Drawer with lock and key (above CPU space) |